PEDAN DAM


Project Data

Client: Federal Capital Development Agency, Abuja, Nigeria
Civil Contructor: Strabag Construction Nigeria
Completion date: 1992
Picture: Construction of earth fill embankment
and the intake tower as well as the control house.

Karolak GmbH completed the hydraulic design for the intake tower, the discharge tunnel and the distribution mains into Abuja, DN 300 D.C.I. And DN 400 D.C.I..

In 1997/1998 the bottom discharge roller gate, sliding gate and the complete lifting gear for both gates have been replaced by us on order by Strabag Const. Nig.. We undertook the complete Engineering design and supply as well as installation of the equipment on site.

The project was completed in 1998. The gates were tested and operated throughout the defect liability period of 6. Months.

Final handing over took place in 1999.